IF YOU HIRE CONSTRUCTION CONTRACTOR(S)
- Mar 25
- 1 min read
PER OUR EXISTING RULES & REGULATIONS:
36 CONTRACTED CONSTRUCTION WORK
36.1 All construction debris must be promptly removed by the contractor and disposed of outside of the condominium property.
36.2 The Association dumpsters shall not be used by contractors or unit owners for construction debris created by contractors.
36.3 Construction work shall cease by 6 P.M. each day. No construction work is permitted on Sundays or holidays except under emergency conditions.
36.4 No contractor shall use any electrical outlets on the common elements or pull power from any other unit then that where they perform their services, without permission.
36.5 Contractors shall contact the manager and all appropriate utility providers when attempting to dig holes, tap water or sewer lines, or connect to primary electric lines.
36.6 Contractors shall not dig holes, tap water or sewer, access primary electric lines or begin new projects after 4 P.M. or before 8 A.M., and not at all on Saturdays and Sundays except under emergency conditions only.
36.7 All contractors shall keep their construction sites clean of debris.
36.8 All contractor’s signs are to be removed from the construction site at the completion of all construction. If they are not removed, the signs will be removed by the Association.
In addition, be sure to post any permits for work in processs at your unit as required by local ordinances.
Last but not least, reminder that all work on your unit MUST be PRE-APPROVED and requires a Change/Addition form be filled out and submitted to the Architectural Review Committee PRIOR to commencing any improvements. This includes DIY work.
Thank you,
~ Your Association Team