UPDATE on the paving project!
- Nov 4, 2025
- 2 min read
We Love Our New Asphalt — And We’re Working on a Few Repairs
We are thrilled with the fresh new asphalt throughout our community — it has truly improved the look, feel, and safety of our roads. Thank you to everyone for your patience during the paving work. The upgrade has been a long-awaited improvement, and we are grateful to see our property looking better than ever.
As with any large-scale project, there are a few areas that still need attention. We are aware of the catch basins that require repair, and the contractor is addressing that today into tomorrow. Additionally, a few residents experienced damage during the paving project. Those will be addressed today as well.
Lapwing & Oakdale Corner Update
Please note that the NW corner of Lapwing and Oakdale requires extensive repair. This area will need to be remilled and new asphalt poured to ensure a long-lasting fix.
To allow proper curing time and avoid disruption during peak season, the full repair will take place after season. In the meantime, a temporary patch will be installed to maintain safe and usable conditions.
Gate Access
The exit gate has been temporarily open due to severed wiring between the underground plate and the gate tower that was unavoidable during our sewer line project. Our vendor is already scheduled, and repairs are expected to be completed this week.
In addition, the entrance gates will remain open today and tomorrow to allow access for the repair team and equipment.
Thank you again for your patience and cooperation throughout this project. We are happy to enjoy the new roadways and are committed to completing the remaining work as quickly as possible.
~Your Association Team