Update week ending August 7th, 2026
Good afternoon, Holiday Condo and Happy Monday!
I trust everyone had a great weekend. The board and management team are pleased to provide the owners with a summary of our current projects.
Fiber Optic
Crews have visited the site and backfilled areas that had settled and repaired / poured concrete. We have been advised our go live date is now scheduled for 9/30. We will keep you informed about upcoming informational meetings with our account representative.

Indoor Pool
Crews returned this past week to correct some minor deficiencies. A grand opening will be scheduled in the next week or two after we reinstall signage and get everything ready for your enjoyment. We are very pleased with how everything turned out and look forward to sharing with you very soon.

Governing Documents
The revised HC Condominium Governing Documents have been distributed to the owners via the HC Website and email. Three copies of the current and proposed documents can be found at the South Hall. Two owner’s workshops have been held at the South Hall and via Zoom. Weekly blogs are posted to the HC Website, and email, where owners can go to see factual comparisons between the existing and proposed documents. We are committed to providing our ownership with the most accurate information enabling you to make your decision. Again, these are DRAFT documents, and we welcome all constructive input and questions.

Water Valve Replacement
Atlas Drainworx was on site this past week excavating and installing new water valves. The total number of valves that have been replaced to date is twenty-nine. This completes the first phase of the water valve replacement project. There are six valves between the homes on 13th and 14th streets which will be replaced later, along with the installation of at least one eight-inch valve near the Tennis / Pickle ball courts.
If by chance you may still be experiencing low water pressure, we recommend you change the aerators on your sinks and showers to ensure there is no sediment reducing your water flow. Additionally, if you have a whole house water filter, we recommend those be changed as well.
A planned shut off is scheduled for THURSDAY, August 13th, at 9am. Please prepare as needed for your daily activities.
Tennis Courts
Resurfacing of Tennis / Pickleball courts which were scheduled to begin August 10th, have now been pushed off a few days due to current forecasted storms.
Street improvements
Street improvements this year will likely be limited to sealing of asphalt. There will also
be repairs made around some of the drain boxes. This work is scheduled to begin
sometime in late September or October
“Please check the Holiday Condo Website for important updates and information. The Board of Directors and Park Management does not post park business on Happenings, Connections, and Advocates FB pages.”
Lastly, I want to thank Pete Lallo and the management team for all they do. It takes a huge effort to keep the park operating, regardless of the number of people on site.
Thank you,
Kevin Stevens, President